Skip to content
Penahak now runs hotels, restaurants and retail on one ledger.
Penahak

Bill of material

A bill of material is the recipe of a product: what one run makes, which raw materials it uses, the fixed costs and the by-products. It must be approved, and not locked, before a production order can use it. It moves no stock.

  • Accounting Production
  • 4 min read
  • Updated October 20, 2026

For Production staff Owner or manager

On this page

What it holds

Open Bill of Material (menu Production Entries › Bill of Material, usual label). A BOM has a header and three lists:

PartFields
HeaderVoucher No, Date, Cost center, Product (the finished product) and QTY (what one run of the recipe makes), Warehouse (where the finished product goes), Mechanic / Operator, Machine / Plant, Reference number
Raw materialEach Raw Material with its Warehouse (where it is taken from) and QTY for one run
Fixed costA Fixed cost title, a Ledger and the Amount for one run
By-product / ScrapA By product, its Warehouse and QTY for one run

The quantities are for QTY of the finished product. When you produce a different quantity the journal scales them: a recipe for 100 that you run for 250 takes two and a half times the raw materials.

Make a bill of material

  1. Choose Add
    Who
    Production manager
    Where
    Bill of Material > Add
    What changes
    Voucher No shows NEW: the number is given when you save. No Add button means no numbering series (Set up production).
  2. Fill the header
    What changes
    Date, Cost center, the finished Product, its QTY and the destination Warehouse are required. Add the Machine / Plant and Mechanic / Operator if you use them: a machine can be added from the form (Machine / Plant, Manufacturer, Machine/Plant number).
  3. Add the raw materials
    What changes
    On the Raw material tab choose a product, its warehouse and the quantity. Add a line for each.
  4. Add fixed costs and by-products
    What changes
    On the Fixed cost tab choose the title (or add one with its Ledger) and the amount; on By-product / Scrap add what the run also produces.
  5. Save
    What changes
    "Bill of material (number) saved successfully." The BOM is Unapproved.

Approve and lock

  • Approve: where approval is on for the BOM and you are an approver, Approve on its page marks it Approved: "BOM authorisation saved successfully." A new BOM saved by an approver is approved at once where your company's Entry control for production enables it.
  • Lock / Unlock: a locked BOM cannot be chosen for a new production order. Lock a recipe you have retired ("Do you want to lock BOM?"). Unlock to use it again.

A production order can only use a BOM that is Approved and not Locked (Production order).

Delete and copy

Delete is possible only while the BOM is not approved and not locked; otherwise it is refused. The button is not shown at all when your company has IRD switched on. Copy to new starts a new BOM with the same lines, for a similar recipe.

Common questions

The BOM is not offered on the production order.

It is not approved, or it is locked. Approve it, or unlock it (Production order).

There is no Approve button.

Approval is not switched on for the BOM, or you are not in its approver group (Set up production, Approvals for purchases and vouchers).

I changed the recipe. Do old journals change?

No. A journal keeps the quantities it was made with.

Related guides

More in Production