Skip to content
Penahak now runs hotels, restaurants and retail on one ledger.
Penahak
Solution

Manufacturing ERP software for Nepal

Bill of materials, raw-material consumption, quality pass and finished-goods costing that flows into real inventory value.

What we hear

The problems that bring people to us

If you make what you sell, your margin depends on knowing what a finished unit actually cost. Penahak consumes real stock and produces real costed output, so inventory value and gross margin are derived rather than estimated.

Finished-goods cost is an estimate

Without a bill of materials and real consumption, unit cost is back-calculated from purchases and never quite matches reality.

Wastage is invisible

If wastage and by-product are not recorded, yield problems show up only as a margin that is quietly worse than expected.

Rejected output still gets sold

With no quality gate between production and saleable stock, failed batches reach customers.

Landed cost is ignored

Freight, duty and clearing on imported raw material never reach item cost, so every downstream margin is overstated.

A day on Penahak

One chain of documents, start to finish

Each step below creates or references a real document. Nothing is retyped between them, and every figure at the end traces back to the action that caused it.

Read the step-by-step guides

Raw material received; freight and duty allocated as landed cost Inbound
Production order raised against the bill of materials Production
Output recorded with rejects and by-products on the production journal Production
Materials leave stock when the journal is approved at the quality check Quality
Finished-goods costing rolls up into inventory value Costing
Consumption and costing reports list each production journal Review
Typical setup

The modules most businesses like yours run

A starting point, not a fixed bundle. Add or drop modules once we have seen how you operate.

What changes

What you should expect to be different

Not features — outcomes. If these are not true six months after go-live, something has been configured wrongly and we want to hear about it.

  • Unit cost is built from actual material, wastage and overhead
  • Landed cost reaches item cost, so gross margin is honest
  • Quality pass sits between production and saleable stock
  • Inventory value in the balance sheet is derived from real movements
  • Rejected quantity and by-products are recorded on each journal
Reporting

The reports you will live in

Many totals open the document behind them.

  • Bill of material
  • Production journal
  • Raw material consumption
  • Finished goods costing
  • Quality pass detail
  • Landed cost
Compliance

Nepali obligations handled in the core

IRD-ready fiscal invoicing

Fiscal invoice behaviour is built into the sales invoice and POS paths themselves rather than added on top, with IRD synchronisation, VAT customer and vendor summaries, and an audit trail written as you trade rather than reconstructed afterwards.

Nepali fiscal year and dates

Bikram Sambat fiscal-year control, business-date close and dual-date handling throughout documents and reports.

Payment methods

Cash, card, bank transfer, QR and wallet payments are recorded against the bank account you choose. Penahak does not move the money.

English and Nepali

English and Nepali in the accounting, inventory, retail POS, HR and report screens. The hotel, restaurant and CRM screens are in English.

Controlled corrections

With IRD on, saved invoices cannot be changed: they are corrected by returns or same-day cancels. Approved, reconciled and locked documents cannot be edited, and edits are logged.

Role-based security

Granular roles and permissions, sign-in by listed IP addresses, account lock after wrong passwords, user activity logging and account start and end dates.

Getting there

How a go-live actually runs

01

Discovery

We map your outlets, books, stock locations and statutory obligations, and agree what go-live means.

02

Configuration

Chart of accounts, tax and bill terms, document numbering, godowns, roles and payment methods, checked before the first live day.

03

Migration

Masters, opening balances and opening trial imported and reconciled against your closing figures.

04

Training

Role-based sessions for owners, cashiers, front desk, kitchen, storekeepers and accounts, using your own data.

05

Go-live

One full test cycle end to end, then supervised go-live with a support engineer on hand.

06

Aftercare

Ongoing support, new releases, and the help centre’s step-by-step guides.

Help centre

Where your team starts

The guides your staff use after go-live, written from the Penahak screens.

Open the help centre

Built for Manufacturing

Book a walkthrough and we will demo the modules that match how you actually trade — not a generic slide deck.

No obligation. Typically 30–45 minutes.